Aracion

WE MAKE TECHNOLOGY PROVABLE.

Proven in the lab. Proven in the facility. Proven in operation.

ALVEX delivers accredited test results. Products builds chambers and facilities to agreed, measured performance. IT runs infrastructure against service levels you can audit.

ALVEX CATR · Bengaluru
Quiet zone 1.5 m
1.49 GHz to 24 GHz
5G FR1 and FR3
ISO/IEC 17025:2017

WHAT WE DO

THREE OFFERINGS. ONE ACCOUNTABLE PARTNER.

ALVEX RF chamber

PROOF BY ACCREDITED MEASUREMENT

ALVEX

Aracion Lab for Validation and Excellence

Accredited RF, OTA and wireless conformance testing, with environmental, regulatory and operator support from first prototype to market access.

  • CATR OTA for FR1 and FR3
  • UE and base station RF conformance
  • Wireless, IoT and environmental
  • Regulatory and market access
Explore ALVEX
Aracion product chamber

PROOF BY ACCEPTANCE TESTING

Products

Chambers, ranges and shielded facilities designed, built and validated against acceptance criteria agreed before manufacture starts.

  • Turnkey EMC, RF and OTA laboratories
  • EMC, antenna and CATR chambers
  • Shielding and SCIF facilities
  • Absorbers, accessories, instrumentation
Explore Products
Aracion IT infrastructure

PROOF BY UPTIME AND SECURITY EVIDENCE

IT

Architecture-first infrastructure, security and cloud services, delivered with clear scope and a support-ready handover.

  • Infrastructure and endpoints
  • Cybersecurity
  • Cloud and application modernisation
  • Managed services
Explore IT

WHY ARACION

PERFORMANCE GUARANTEED. NOT JUST INSTALLED.

Most test laboratories are delivered as equipment integration projects. Equipment is installed and handed over, and real chamber performance is only discovered during commissioning.

Aracion works differently. We agree measurable acceptance criteria at concept stage, take responsibility for the performance of the finished facility, and do not hand over until every approved parameter is measured, validated and documented.

Aracion chamber testing facility

PROOF 01

We operate what we build

Our own CATR runs accredited conformance work every week. Our chamber designs are proven in daily use, not only on paper.

PROOF 02

Criteria before steel is cut

Every project starts with a Facility Performance Test Plan: NSA, SVSWR, shielding effectiveness, field uniformity, quiet zone.

PROOF 03

Precise about accreditation

We publish exactly which tests sit inside our ISO/IEC 17025 scope and which are engineering services.

PROOF 04

One team to handover

Design, manufacture, integration, validation and operator training under a single project owner.

ARACION IN NUMBERS

2014
Founded
1000+
Projects Delivered
150+
Clients
10+
Countries Served
5
Locations
ISO/IEC 17025
Accreditation

WE INNOVATE. WE COMMIT. YOU EXCEL.

LET'S BUILD WHAT'S NEXT

Planning a laboratory, booking a test campaign or modernising your IT? Start with a conversation with the engineers who will do the work.